Saturday, 31 July 2010

one day to go...

Its now 3pm on Saturday the 31st of July, and tommorow i pack up and head home.
 Already the peak 2010 site is emptying out at a rapid pace, the big marquees are comming down, what was once an area full of tents is now nothing but patches of yellow grass.

Half of the water system is being removed (subcamps kazakh, everglades, himalayas,pacific and arctic ) and the toilets on that side of the camp are shut, making it a bit of a long walk for facilities to those who are still on site.
 There should be some more photos of the dismantling of peak coming soon.

No comments:

Post a Comment